Working fire in Stickney, 1-24-21

This report comes from Chi-Town Fire Photos:

On January 24, 2021, around 6:00 AM, Stickney Engine 1203 responded to a single-family home on Wenonah Avenue at 4225. The structure was a 1.5-story house with visible smoke coming from the first floor. Upon arrival, Engine 1203 deployed a 1.75-inch pre-connect and quickly located a fire on the ground level. The crew made a swift knockdown of the fire, and it did not spread beyond the initial area.
Companies that responded to the call included:
Stickney: 1203, 1210, 1215
Central Stickney: 906
Forest View: 812
Lyons: 1301, 1311
Berwyn: 906
pre dawn fire in Stickney IL

Chi-Town Fire Photos

The incident highlights the quick response of local firefighters who were able to contain the fire before it could spread further. The use of a pre-connect allowed for immediate water delivery, which is critical in controlling fires in their early stages. It’s always reassuring to see such effective teamwork during an emergency. If you're interested, there are more photos available from this event in the gallery below.

Railway Tools

Various tools are used for the manipulation of rails. These are primarily for the unloading or loading of rails and the longitudinal distortion.
Various designs of loaders are available, including self-propelled equipment, but also loading cranes, which can be mounted on rail cars. A rail lifting clamp is necessary for the safe lifting and manipulation of rails. It is important to note that when rails are unloaded there should not be too much deflection or elongation and care should be taken not to damage the rail surface.

Railway Tools,Roller Linear Guide,Roller Rail Track,Roller Guide Rails

Shenyang Lubang Railway Maintenance Machinery Co.,Ltd. , https://www.srmfrailwayequip.com

Posted on